Customization: | Available |
---|---|
Type: | Steel Plate |
Standard: | ASTM, AISI, GB |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name |
Stainless Steel Sheet/Plate |
Length |
as required |
Width |
3mm-2000mm or as required |
Thickness |
0.1mm-300mm or as required |
Standard |
AISI,ASTM,DIN,JIS,GB,JIS,SUS,EN,etc. |
Technique |
Hot rolled / cold rolled |
Surface Treatment |
2B or according to customer requirement |
Thickness tolerance |
±0.01mm |
Material |
201, 202, 301, 302, 303, 304, 304L, 304H, 310S, 316, 316L, 317L, 321,310S 309S, 410, 410S,420, 430, 431, 440A,904L |
Application |
It is widely used in high temperature applications, medical devices, building materials, chemistry, food industry, agriculture, ship components. |
MOQ |
1 ton , We can accept sample order. |
Shipment time |
Within 15-20 workdays after receiving deposit or L/C |
Export packing |
Waterproof paper, and steel strip packed. |
Capacity |
250,000 tons/year |
Q1. Where is your factory ?
A1: Our company's processing center is located in Shangdong, China.
Which is well equipped with kinds of machines, such as laser cutting machine,mirror polishing machine and so on.
We can provide a wide range of personalized services according to the customers' needs.
Q2. What are your company's main products ?
A2: Our main products are stainless steel plate/sheet, coil, round/square pipe, bar, channel, etc.
Q3. How do you control quality ?
A3: Mill Test Certification is supplied with shipment, Third Party Inspection is available.
Q4. What are the advantages of your company ?
A4: We have many professionals, technical personnel, more competitive prices and best after-dales service than other stainless steel companies.
Q5. How many coutries you already exported ?
A5: Exported to more than 50 countries mainly from America, Russia, UK, Kuwait, Egypt,Turkey, Jordan, India, etc.
Q6. Can you provide sample ?
A6: Small samples in store and can provide the samples for free.
Customized samples will take about 5-7days.